- metallic
structures up to 180 m height - 50,000 t/year
- tanks up to 50,000 m3 volume - 20,000
t/year
- spherical tanks up to 5,000 m3 volume
- 2,500 t/year
- equipments up to 1,000 t from pieces (350
t/piece) - 120,000 t/year
- high pressure and temperature piping systems
- 60,000 t/year
|
|
|